The Open Group Open CITS Certification - Problem Reporting and Interpretations System
You are here: Certification > Open CITS Certification  > Problem Reporting System

Problem Report 0007 Details

Help Show help for this page


Click here to view your privileges

This page provides all information on Problem Report 0007 and all reviews you are authorized to see.


Report 0007 Actions


    Problem Report Number 0007
    Submitter's Classification Specification problem
    State Resolved
    Resolution Interpretation (INT)
    Problem Resolution ID INT.ITSC.0003
    Raised 2008-08-28 20:13
    Updated 2008-09-26 22:27
    Published 2008-09-26 22:27
    Documents Accreditation Requirements
    Certification Program Open CITS Certification Program
    Specification Open CITS Accreditation Requirements Version 1.0
    Location in Spec 4.3.3
    Problem Summary ACP Boards may operate as panels rather than serial interviews
    Problem Text An applicant for accreditation wishes their Boards to operate as
    interview panels, in which a 1 hour interview take place between a
    candidate and the board members simultaneously rather than one at a time.

    Given the more demanding environment for candidates, and the way in
    which the board may behave as a group, it is considered most unlikely
    that a candidate would be accepted by this approach but rejected by
    serial interviews. There is therefore no expected reduction in the
    quality of the program.

    An ACP operating with panels should be required to change the
    composition of the panel at least once every 12 months.

    An ACP may have more than three interviewers on a serial Board or a
    panel and may have more stringent voting rules than are required by the
    ITSC program, for example a requirement for unanimity instead of majority.

    ACPs that wish to operate serial boards may of course continue to do so

    No change is implied for the way direct boards operate

    Review Information

    Review Type SA Review
    Start Date 2008-08-28 20:13
    Last Updated 2008-08-28 22:04
    Completed 2008-08-28 22:04
    Status Complete
    Review Resolution Interpretation (INT)
    Review Conclusion Proposal accepted by IBM.

    Under the resolution tab/dropdown, I'm not quite sure what to put there
    given the options, so I have left it as no resolution given. I hope this is
    appropriate.

    Problem Reporting System Options:

     

   |   Legal Notices & Terms of Use   |   Privacy Statement   |   Top of Page   Return to Top of Page