HomeAbout Us A-Z IndexSearch * Contact Us Register LoginPress Shop

The Open Brand -- Problem Reporting and Interpretations System


Problem Report 0756 Details

Help Show help | Quick Search | Submit a Test Suite Support Request | Click here to view your privileges

This page provides all information on Problem Report 0756.


Report 0756 Actions


    Problem Report Number 0756
    Submitter's Classification Specification problem
    State Resolved
    Resolution Temporary Interpretation (TIN)
    Problem Resolution ID TIN.X.0047
    Raised 1970-01-01 08:00
    Updated 2003-03-13 08:00
    Published 1995-09-20 08:00
    Product Standard Commands and Utilities V2 (UNIX 95)
    Certification Program The Open Brand certification program
    Test Suite VSC version 4.1.4
    Test Identification POSIX.upe/ex 202
    Specification Commands and Utilities Issue 4 Version 2
    Location in Spec See Problem Text
    Problem Summary TIN4C.00014 This test may fail on implementations that position the current line indicator on the last line moved after a move command.
    Problem Text
    This test may fail on implementations that position the current
    line indicator on the last line moved after a move command.

    This test checks to see that the current line indicator will be
    set to the first of the lines moved after a move command takes
    place. This is the behavior currently mandated by the ex spec.

    POSIX 1003.2b/D11 has respecified this behavior such that the
    current line indicator will be set to the last of the lines moved
    after a move.

    Our implementation follows the .2b mandated behavior and therefore
    fails the test.

    We believe the X/Open spec should be relaigned to with .2b and
    the test should allow this behavior.
    Test Output

    Assertion #202 (C): setting of current line after <range>move command
    Note: The behavior associated with this assertion is expected
    to change in a future revision of POSIX.2.
    expected current line 2, was line 3
    Command failed: 'checkline ex_data_1 2'
    expected current line 3, was line 4
    Command failed: 'checkline ex_data_2 3'
    Assertion Result: FAIL

    Review Information

    Review Type TSMA Review
    Start Date null
    Completed null
    Status Complete
    Review Recommendation No Resolution Given
    Review Response
    Anticipating acceptance of the completely rewritten ex specification
    in POSIX 2003.2b/D11 and the eventual alignment of the tests with it
    a temporary interpretation is recommended.

    Review Type SA Review
    Start Date null
    Completed null
    Status Complete
    Review Resolution Temporary Interpretation (TIN)
    Review Conclusion
    A Temporary Interpretation is granted.

    Problem Reporting System Options:

     

    Back   


Contact the Certification Authority