|
Home About Us A-Z Index Search * Contact Us Register Login Press ShopThe Open Brand -- Problem Reporting and Interpretations System |
Problem Report 0330 Details
Show help | Quick Search | Submit a Test Suite Support Request | Click here to view your privileges
This page provides all information on Problem Report 0330.
Report 0330 Actions
Problem Report Number 0330 Submitter's Classification Specification problem State Resolved Resolution Permanent Interpretation (PIN) Problem Resolution ID PIN.X.0046 Raised 1995-04-24 08:00 Updated 2003-03-13 08:00 Published 1995-05-17 08:00 Product Standard Transport Service XTI Certification Program The Open Brand certification program Test Suite Unknown version N/A Test Identification N/A Specification Networking Services Issue 4 Location in Spec See Problem Text Problem Summary PIN4.046 Corrigendum C438/U008 for the X/Open Networking Services Issue 4 was issued by X/Open Publications in March 1995, and is available from the X/Open info-server. It contains two changes: 1. Delete the r... Problem Text
Corrigendum C438/U008 for the X/Open Networking Services Issue 4
was issued by X/Open Publications in March 1995, and is available
from the X/Open info-server. It contains two changes:
1. Delete the requirement for certain specified symbolic constants
to have mandatory values; instead, designate these values
as ``recommended only''.
2. Add a new question to the XTI CSQ, to ask for those ``recommended
values'' which have been implemented to be identified.
For completeness, the list of constants for which values are changed
from mandatory to recommended are:
General definitions for option management
T_ALLOPT
XTI-level
XTI_GENERIC
XTI-level options
XTI_DEBUG
XTI_LINGER
XTI_RCVBUF
XTI_RCVLOWAT
XTI_SNDBUF
XTI_SNDLOWAT
Protocol Levels
ISO_TP
Options for QoS and Expedited Data (ISO 8072:1986)
TCO_THROUGHPUT
TCO_TRANSDEL
TCO_RESERRORRATE
TCO_TRANSFAILPROB
TCO_ESTFAILPROB
TCO_RELFAILPROB
TCO_ESTDELAY
TCO_RELDELAY
TCO_CONNRESIL
TCO_PROTECTION
TCO_PRIORITY
TCO_EXPD
TCL_TRANSDEL
TCL_RESERRORRATE
TCL_PROTECTION
TCL_PRIORITY
Management Options
TCO_LTPDU
TCO_ACKTIME
TCO_REASTIME
TCO_EXTFORM
TCO_FLOWCTRL
TCO_CHECKSUM
TCO_NETEXP
TCO_NETRECPTCF
TCO_PREFCLASS
TCO_ALTCLASS1
TCO_ALTCLASS2
TCO_ALTCLASS3
TCO_ALTCLASS4
TCL_CHECKSUM
TCP level
INET_TCP
TCP-level Options
TCP_NODELAY
TCP_MAXSEG
TCP_KEEPALIVE
UDP level
INET_UDP
UDP-level Options
UDP_CHECKSUM
IP level
INET_IP
IP-level Options
IP_OPTIONS
IP_TOS
IP_TTL
IP_REUSEADDR
IP_DONTROUTE
IP_BROADCAST
Also for completeness, the proposed change to the XTI Version 2 CSQ
is to add a further question to the end of the CSQ, after "Optional
Support for Protocols or Protocol Profiles". The troff-encoded text
for this is recommended as follows:
.H 2 "Recommended XTI Header Values Implemented"
\f4Question 13: Does your implementation use all the
recommended values identified in the XTI specification
as "recommended only, not mandatory for conformance"?\fP
.DS I
.\" ANSWER "YES" OR "NO" ON THE LINE BELOW
Yes/No
.DE
.DS I F
If "No", list all those which deviate from the
recommended values. If necessary, use a separate sheet.
.\" LIST ALL THOSE WHICH ARE DIFFERENT, AND GIVE THE
.\" ACTUAL VALUE USED.
Rationale:
.DE
.DS I F
An XTI transport provider does not have to implement
these recommended values in order to be compliant.
However, it is valuable to know this so that users
can easily check whether an XTI application which
relies on these values will be portable to this XTI
implementation: if the answer is "Yes" then such
an XTI application will be portable to this
implementation; if "No" then it will not.
.DE
.P
Reference:
.DS I F
X/Open Corrigendum U008 to Networking Services Issue 4
(X/Open Document Number C438). This Corrigendum revises
Networking Services Appendix F "XTI Headers and
Definitions" to define certain values assigned to
constants as "recommended, not mandatory."
.DETest Output Review Information
Review Type TSMA Review Start Date null Completed null Status Complete Review Recommendation No Resolution Given Review Response
The tests for VST have been coded to allow for this corrigendum.No Discussion comments in this Review.
Review Type SA Review Start Date null Completed null Status Complete Review Resolution Permanent Interpretation (PIN) Review Conclusion
Problem Reporting System Options:
- View Report 0330
- List All PRs
- Search Reports
- Email the System Administrator
- View the The Open Brand Interpretations Database User Manual
Contact the Certification Authority