Problem Report 0007 Details
Show help for this page
Click here to view your privileges
This page provides all information on Problem Report 0007 and all reviews you are authorized to see.
Report 0007 Actions
Problem Report Number |
0007 |
Submitter's Classification |
Evaluation Process problem |
State |
Resolved |
Resolution |
Interpretation (INT) |
Problem Resolution ID |
INT.ITACP.0005 |
Raised |
2007-09-04 23:09 |
Updated |
2007-09-06 19:18 |
Published |
2007-09-06 19:18 |
Requirements |
Open CA Accreditation Requirements Version 1.2 |
Certification Program |
Open CA Certification Program |
Location in Spec |
Certification policy, section 8.2 |
Linked Problem Reports |
0005 |
Problem Summary |
ACPs may need a "grace period" to ensure certified architects are
available to participate in recertification boards |
Problem Text |
Due to pressures on time and availability of resources, an ACP may need
a "grace period" after the nominal recertificatiomn date during which re-
certification may still take place.
The Certification Policy states that recertification must take place before
the third anniversary of certification, but this is felt by some ACPs to be
impractical. The program should allow recertification to take place up to 3
months after the nominal date instead of requiring a full package and full
certification if the date is missed
Impact on direct re-certification needs to be considered |
Review Information
Review Type |
CA Review |
Start Date |
2007-09-04 23:09 |
Last Updated |
2007-09-05 05:35 |
Completed |
2007-09-05 05:35 |
Status |
Complete |
Review Resolution |
Interpretation (INT) |
Review Conclusion |
The SA concluded that if recertification does not happen by the due date,
then the individual will cease to be certified, but at any time in the
following 12 months they may recertify and their ITAC certification will be
re-instated.
The next recertification will be due on the third anniversary of the original
recertification date, i.e. this is not a means to extend the period of
certificaion. |